1. Assembly on welded plates
lt is suggested to mark at the place for fixation to have a beter direction for clamping before assembly, and then weld it. Embed the half lowerpart of the clamp body, put the pipe to be fixed, put the other half clamp body and cover plate, and then tighten it with screw.Do not directly weld the base plate which has already been installed with clamps.
2. Assembly on rail
The rail can be welded on the foundation, or fixed with screw.And then push the rail nut into the rail and turm 90".Embed the nut into the halflower clamp body and put the pipe to be fixed.Put the other half upper clamp body and cover plate, and then tighten it with screw.
3. Multi-level assembly
The rail can be welded on the foundation, or fixed with screw.First the half lower clamp body, and then put the pipe to be fixed.Put the other halfupper clamp body and tighten it with screw.The anti-loose cover plate is used to prevent it from tuming. And then install he second clamp withthe method aforesaid.